Under the Spotlight: Public-private partnership: From Strijp-S to KnoopXL – The role of direction and control

Editie: 33- Public vs. Private

Published on: 15 november 2026


Eindhoven wants and needs to grow significantly in the coming years. In total, 40.000 new homes are planned to support growth to 300.000 inhabitants by 2040 (Municipality of Eindhoven, 2024). The municipality is expressing strong ambitions, and the performance agreements with housing associations are anything but modest. To facilitate this growth, several areas have been designated in the cities’ vision for substantial transformation and densification. The main growth areas are KnoopXL around the central station, WoensXL around the shopping center, and Groots Gestel, the area along Karel de Grotelaan and Kastelenplein. These are large, ambitious urban developments that, according to the municipality, are expected to make a significant contribution to Eindhoven’s future. In a few years’ time, these locations should provide homes for thousands of new residents. At the same time, these developments are expected to address logistical challenges and increase the amount of greenery in the city. The plans are grandiose, but with projects of this scale, the key questions remain: who is really in control, and what will ultimately come true? 

 

The prime example of a successful urban development in Eindhoven is, of course, Strijp-S. While only about half of the total planned housing has been completed (Strijp-S, 2024), the area has already been transformed from a closed-off industrial site into a vibrant and attractive city district, known for its standout architecture. It was construction company VolkerWessels and the Municipality of Eindhoven that jointly took the initiative by acquiring the site from Philips (Strijp-S, n.d.). Park Strijp Beheer was established as the executive agency of this public-private partnership, taking responsibility for both the development and long-term management of the area. At an early stage, housing association Trudo joined as a major stakeholder by acquiring several buildings and development plots, thereby introducing a strong social partner into the collaboration. Although Trudo does not have formal decision-making power within Park Strijp Beheer, its position as a major landowner, including public spaces such as Ketelhuisplein and Leidingstraat, gives it significant influence over the character, atmosphere and programming of the district. The collaboration between multiple parties, each with their own interests, has resulted in an integrated development approach. With a clear, shared area agenda – where ambitions, program and spatial quality were addressed collectively by the development partners – the transformation of the district can be considered a success. 

 

The new focus area for the Municipality of Eindhoven is KnoopXL. The ambitions for the area around Fellenoord and the bus station appear to be even higher than those for Strijp-S: a significantly larger housing program, the development of Eindhoven’s largest infrastructure hub, and at the same time the ambition to transform the area into “a green oasis in the heart of the city” (Open Eindhoven, n.d.). Achieving these ambitions will be considerably more complex than the development of Strijp-S. Strijp-S was acquired as a single entity and, under the direction of Park Strijp Beheer, developed from a vacant site into a vibrant urban district. KnoopXL, by contrast, is a fragmented area with many different landowners, located in the middle of an intensively used and crucial transport hub. As a result, the role of the municipality is fundamentally different, with less direct control, making close collaboration with landowners and users essential to steer the transformation in the right direction. 

 

In recent years, it has become clear that developments in KnoopXL are not getting off the ground. Projects such as Vierlander remain stuck in the planning phase and struggle to move into realization. Whether this is due to stringent municipal requirements on affordability and green space, lengthy procedures, or rising construction costs is difficult to determine. What does seem evident, is that developers are closely watching one another. None of them is willing to be the first to concede to municipal demands, as long as there is a possibility that these requirements may be relaxed at a later stage. The recurring debate on the share of affordable housing repeatedly leaves the door slightly open. Developers, understandably, wait for that door to open further, allowing them more freedom to optimize their programs. It is precisely these ongoing policy fluctuations that prevent developments from truly taking off. 

 

Another striking aspect of the current developments within KnoopXL is the lack of a coherent, area-based approach. Projects currently being developed, such as the Brightlight Towers and Vierlander, largely follow the existing pattern of individual plot-based development (Open Eindhoven, n.d.). While these projects contribute to densification on their own, they do little to achieve a structural transformation of the area. If the municipality aims to realise its ambitions and truly improve infrastructure, green space and spatial quality, larger, integrated interventions are required. Without an overarching urban development strategy, KnoopXL risks becoming little more than a collection of isolated projects, rather than evolving into a new urban hub. 

 

The municipality has chosen to strengthen its grip on the area’s development by deploying the instrument of municipal pre-emption rights (Municipality of Eindhoven, 2024). By securing the first right to purchase land, the municipality can reinforce its position within the area. It is already making active use of this instrument, having acquired several complexes adjacent to the railway and bus station (Stadszaken, 2025). This is a logical step, given the level of influence the municipality can have on the development. The key question, however, is how the municipality intends to shape its collaboration with market parties. Holding a position alone is not enough to initiate and successfully deliver area development. Examples such as Strijp-S demonstrate that strong public-private partnerships are essential to realise a new and attractive urban district. 

 

Acquiring land and establishing a position requires decisive action from the municipality. Not by simply selling plots one-to-one to the highest bidder, but by taking an active role, through a municipal development agency, in managing the area’s development in an integrated manner. This means redistributing plots to improve the urban structure, defining the program, outlining the phasing, setting conditions for mobility, infrastructure and public space, and subsequently selecting the right partners to develop within these frameworks. The municipality has taken the first step with the establishment of the Ontwikkelbedrijf Fellenoord (Fellenoord2040, n.d.). However, it remains unclear what role this entity actually plays in the development process. It does not yet appear to be actively engaging in development through collaboration with market parties. Yet, this is precisely what is needed to create an integrated area, in which housing, functions and amenities are developed not in isolation, but in cohesion. 

 

The question of whether KnoopXL will be a success depends less on how much land the municipality owns, and more on what it does with that position and how it engages with market parties. If it remains a landowner without a clear development ambition, stagnation is likely to follow. However, if it takes on an active role as both director and developer, KnoopXL has the potential to evolve into a successful urban development. By embracing collaboration, the process becomes less dependent on incidental market initiatives and allows for greater steering towards collective value creation. 

 

Public-private partnership is not a fixed formula, but a dynamic interplay that evolves with its context. Strijp-S demonstrates what is possible when vision, trust and clarity of roles come together. KnoopXL is still at the beginning of that process. The coming years will reveal whether Eindhoven is willing to take the step from land policy to true area governance. If it succeeds, this city district too can grow into a new source of pride for the city. 

 

 

About the author: Ir. J.J.W. Dirx 

Joep Dirx obtained his master’s degree in Architecture, Building & Planning from Eindhoven University of Technology, specializing in Urban Systems & Real Estate. He currently works as a project developer at housing association Trudo, where he contributes to a range of residential development projects in Eindhoven. 

 

Joep Dirx - Junior Projectmanager Slimmer Investeren Trudo ...

 

 

References 

Fellenoord2040. (sd). Retrieved March 13, 2026, from Fellenoord2024: https://www.fellenoord2040.nl/ 

Gemeente Eindhoven. (2024, November 26). Omgevingsvisie. Retrieved March 4, 2026, from Eindhoven: https://www.eindhoven.nl/bouwen/omgevingsvisie 

Open Eindhoven. (sd). Brightlight Towers. Retrieved March 13, 2026, from Open Eindhoven: https://www.openeindhoven.nl/projecten/centrum/stationsgebied-knoop-xl/brightlight-towers 

Open Eindhoven. (sd). Ontwikkelvisie Fellenoord. Retrieved April 3, 2026, from Open Eindhoven: https://www.openeindhoven.nl/projecten/centrum/stationsgebied-knoop-xl/ontwikkelvisie-fellenoord 

Stadszaken. (2025, October 10). Eindhoven versterkt grondpositie KnoopXL en koopt twee gebouwen. Retrieved March 13, 2026, from Stadszaken: https://stadszaken.nl/artikel/8336/eindhoven-versterkt-grondpositie-knoopxl-en-koopt-twee-gebouwen 

Strijp-S. (2024, June 11). Start van de laatste fase Strijp-S: Design District van start. Retrieved March 13, 2026, from Strijp-S: https://www.strijp-s.nl/nieuws/start-van-de-laatste-fase-strijp-s-design-district-van-start 

Strijp-S. (sd). De geschiedenis van Strijp-S. Retrieved March 13, 2026, from Strijp-S: https://www.strijp-s.nl/historie 

 

Mail the editors